Spinzilla 2015

For a third year in a row I joined Team Sweet Georgia for Spinzilla 2015. At the outset of this wonderful spinning challenge I decided two things:

  1. I was going to spin for a project or two. You make an enormous amount of yarn when you do nothing but spin for an entire week. This was a good chance to spin for a blanket or a sweater.
  2. I wasn’t going to kill myself or make my life miserable. I was just going to spin whenever and where ever I could and hope I’d at least match my total from 2014 – 6,574 yards.

So with those decisions made, I set out to get my fibre ready. First this was to card all the rest of the beautiful, white Targhee wool I used in the Blanket Project post. Over a couple of days I made 15 – 50g batts. That’s a decent amount of fibre. I would spin this in the same way I spun for the Blanket Project, with the goal of making my own blanket – warp and weft.

I also rooted through my fibre stash from the Sweet Georgia Fibre Club and came up with three braids that looked a lot alike. Not exactly, but all three had purple, a fushia and a strong red in them. I decided that I’d spin each on fairly fine and make a three-ply yarn. Twelve ounces of fibre, that would make a decent amount of yarn.

And here are the results:

By the end of day #5, I had most of the white wool spun and some of it plied. I finished plying it on Saturday morning (day #6)

2015-10-09 15.13.06

Then on day #6, I finally started spinning colour! ┬áHere’s the first braid – it’s superwash Targhee and the colourway is called “Open Hands.”

2015-10-10 16.11.17

Here are all three being plied on the evening of day #7. From top to bottom: Open Hands, Modern Mandarin, Bougainvillea – all from Sweet Georgia Yarns. Word of warning: plying three bobbins that were recently spun is a recipe for disaster. The twist in the newly spun singles was fresh and quite active. I wasted a lot of time untangling things. In hindsight, I should have spun these three braids first, then all the white wool. That way these bobbins would have rested for at leave five days before plying and wouldn’t have been such a nightmare.

2015-10-11 21.03.34

And here is the final result. 8,627 yards, that’s 4.9 miles. That’s a lot of yarn. That small blue and gold skein is 185 yards of singles from my spindle. I took it to work with me on day #3 and got a lot done during a 2.5 hour meeting.

12391885_10156418949180571_5655529311090643373_n

Leave a Reply